text.skipToContent text.skipToNavigation

Elektro Internationaal - Worry-free Vendor Managed Inventory

Optimising internal logistics is often a challenge for panel builders, from grab stock management to getting a grip on delivery times. Especially when production is spread across multiple sites, like at Elektro Internationaal (EI) in Woerden. In 2016, the company already took a big step, together with itsme Connected Business, at their batch production site. This was related to the introduction of Vendor Managed Inventory (VMI) in the form of a 2BIN system. In the near future, EI expects to start the construction of new premises, whereby all activities will be brought under one roof. At that point, the logistics for the entire production will also be optimised.


Elektro Internationaal is one of the leading players in our country in the field of panel building and control technology. The company designs and builds distribution and control cabinets for a wide range of markets, from non-residential buildings, data centres and healthcare institutions to retail, chemicals and the pharmaceutical industry.

Questions on optimising internal logistics?

Fill in the form and we will get back to you!

EI has 115 employees, including flexible deployment, and operates across four premises (in total, 4,500 m2) in Woerden. This is far from optimal for production and internal logistics in terms of efficiency. There are plans for a brand-new replacement building (in total, 6,000 m2). Provided all permits are granted this year, the new premises should be ready for use by early 2025.


Professionalised logistics

The organisation of the logistics in the new building will be handled by Ber de Vor. He joined the company on 1 August as Supply Chain Coordinator after graduating from the University of Applied Sciences Utrecht in logistics management at EI. “That was about internal logistics, but on the front end also about ordering methods and liaising with suppliers. I’m now looking at how we can optimise logistics processes. For as long as we still have several sites, there are ways to benefit in terms of internal transport. In that respect, I am looking forward to the new premises. I want to work out the layout of it as comprehensively as possible and will consult suppliers like itsme.” “For the existing situation, it’s also about optimisation,” explains Bart Ranke, Finance, Logistics and ICT Manager. “We have already professionalised our logistics processes to a reasonable extent. In 2016, at our biggest site for batch production, we opted for VMI in the form of a 2BIN system for gripping materials. As a panel builder, we mainly carry the Schneider Electric brand; we source most electrical components from them. For gripping materials such as wire and fasteners, we already have a long-term relationship with itsme. This has been strengthened even more with the implementation of the 2BIN system.”

“itsme was the most flexible party for materials supply.”

“VMI is one of the logistics concepts offered by itsme,” explains Dennis Hermans, Account Manager OEM at itsme. “We were able to demonstrate with a calculation of the total cost of ownership that it paid off to accommodate low-value materials for batch production in a VMI system. For EI, the big advantage of this is a completely worry-free solution for these products; it has led to a reduction in purchase orders and the number of accounts payable. In addition, downtime, which should certainly not happen in batch production, has been avoided with the VMI system managed by itsme.” At EI, the system in question was the 2BIN system, with two trays for each material. If one is empty, the customer uses the other, while itsme replenishes the stock in the empty tray. “EI opted for itsme as its VMI partner because of its flexibility,” explains Ranke. “We have preferences for certain materials we use in our cabinets and itsme was the most flexible party in terms of materials supply.


New technical challenge

“In the new building, EI plans to introduce VMI for the entire production, including for cabinet production in small quantities,” says Ranke. “We use different materials for that, so there will probably be several 2BIN setups in the new building, with different contents. That’s something Ber will look into.” It would allow EI to achieve even more logistical benefits. “The biggest efficiency boost is simply the fact that we are going from four buildings to one. We will save on staff, traffic and walking routes by no longer having to drive back and forth with materials and grab stocks when there is a shortage somewhere.” Hermans: “To us, the main win is that we can maintain continuity in the relationship with EI and continue to make a demonstrable contribution to their success. We have once again demonstrated the added value of itsme through an optimised VMI system.”

“In the new building, there will be several 2BIN setups.”

For now, EI has its work cut out on the logistics arrangements for the new building, which it hopes will be completed soon. “Nevertheless, we still have more aspirations,” says Ranke. “Control technology is now a side business for us, but we want to develop in that area. With the current scarcity in the labour market, it is great to be able to call on a partner like itsme, which has in-house specialists for programming components.” Hermans certainly welcomes this. “We will be able to serve EI even more at their new location with our logistics concepts and, in addition, will look at what else we can do for them in terms of control technology.”


No worries

This is what keeps the cooperation alive. “For the 2BIN system, it was smooth sailing right from the start,” says Ranke. “In the first few months, we had to fine-tune order quantities and item selection in close consultation. After that, the process was clear to all parties and it began to run like clockwork. It still does. Our site manager recently mentioned that communication is going well, for example about big upcoming projects, so that order quantities are increased in time. It’s just nice that we can go over things like this with someone from itsme on site, that there is interaction instead of arranging everything on a computer. We thought we would be able to pick it up ourselves, but it’s good that it has been placed in the hands of a party that is working on it on a daily basis and who can take away our worries.” “That is exactly what the system is for,” confirms Hermans. “Every week we visit to do a scan and replenish stocks; EI doesn’t have to worry about that. In the background, we also perform backorder monitoring on the 2BIN materials. Every week we run reports and if they contain items with a lead time above a certain deadline, we coordinate with EI. It’s all about taking the worry out of the equation.”


 

 

Check out our other success stories:

  • TESTIMONIAL
    14 jul. 2025
    Sekisui Alveo
    Foam producer Sekisui Alveo has a large factory in Roermond. To support production and maintenance, warehouses and distribution points with thousands of different items are spread across the various halls. Think spare parts, personal protection equipment and consumables. The company cooperates intensively with itsme for management, such as recently with the step-by-step introduction of vendor managed inventory (VMI) for the grab stock of mechanical items.
    Read more
  • TESTIMONIAL
    18 jun. 2025
    IEC
    To control the expansion of a silo park, engineering & construction company IEC called on Breemes. Being involved in the engineering from the beginning, the electrical service provider was able to make smart proposals for both the low-voltage part and the PLC control. ‘We have always been able to find each other well and when changes occurred, we were quickly on the same page with Breemes.’
    Read more
  • TESTIMONIAL
    14 mei 2025
    Heliox - Charged for Delivery
    Heliox, a developer and manufacturer of charging systems for electric buses and trucks, was already working with itsme when production still took place in the Netherlands. Today, production has shifted to Slovakia, Portugal, and Moldova, and is also happening in the US. itsme remains the “irreplaceable” partner for the supply of electrical components and cable harnesses.
    Read more
  • TESTIMONIAL
    23 apr. 2025
    BLOK System Supply
    Blok System Supply and itsme have maintained an intensive relationship for many years. Early last year, this was further deepened with electronic data exchange via the Smart Connected Supplier Network. ‘It saves an enormous amount of time and reduces errors. We always have real-time information automatically.’ However, time for personal contact is not saved. ‘That is precisely what makes itsme a very nice party to work with.’
    Read more

Stay up to date with the latest news:

  • NEWS
    29 sep. 2025
    Schneider Electric - Simplified wiring
    Thanks to intuitive spring clips, TeSys Deca Snap-In enables contactors and motor protection switches to be connected in just two seconds per wire. That is up to 96% faster than traditional connection methods.
    Read more
  • NEWS
    26 sep. 2025
    nVent ERIFLEX -Distribution blocks
    nVent ERIFLEX distribution blocks: ideal for connecting the power cable or output of machines or industrial equipment (such as inverters, air conditioners, etc.) and offering high short-circuit resistance, time savings and reliability in every switch cabinet.
    Read more
  • NEWS
    24 sep. 2025
    Eaton - S711 softstarter
    The S711 sets new standards in soft start technology. This brand new soft starter is not only smarter and more powerful, but also equipped with advanced control and protection functions. In addition, it introduces a groundbreaking service interface based on Bluetooth LE (Low Energy).
    Read more
  • NEWS
    22 sep. 2025
    Eaton - Eaton – Ultra-Compact DM1 General Purpose Drives
    Eaton’s PowerXL DM1 variable frequency drives deliver maximum functionality in an ultra-compact housing, making them ideal for applications with limited installation space. Despite their small size, they offer the full capabilities of a universal drive, including pump and HVAC settings as well as control of both conventional asynchronous and PM motors.
    Read more

Why not take a look at these trainings we offer: