Eneco - Green light for green electricity and steam

Eneco Bio Golden Raand, located in the port area of Delfzijl, converts biomass into green electricity and green steam. Each year, the plant processes approximately 300,000 tons of waste wood from the Netherlands and neighboring countries. As part of Eneco’s climate ambitions, a project was initiated in 2022 to replace the existing fluorescent lighting in and around the boiler room. The project was carried out under the supervision of itsme. “Two factors were important in this process: the cost, of course, but also the level of service.”


The term biomass sometimes sparks public debate. Eneco applies strict criteria to its use and exclusively utilizes B-category waste wood at Eneco Bio Golden Raand. This includes wood that can no longer be reused, such as old furniture and construction or demolition waste. It is collected by specialized recycling companies and processed into wood chips, which are burned in the boiler room.

Want to know more about fixtures?

Fill in the form and we will get back to you!

Boiler Room

Through an ingenious transport system, wood chips are precisely fed into the boiler, where temperatures reach 900°C. The combustion boiler features a circulating fluidized bed and an extremely hot sand bed, ensuring optimal combustion of the wood chips. This design allows Eneco to extract nearly 2% more energy from biomass compared to an average biomass plant. Additionally, the facility meets the strictest emission standards, thanks to an advanced flue gas cleaning system. The immense heat generated during combustion is used to produce steam at a temperature of 550°C.


A portion of the steam is used to generate electricity through a complex technical process involving a turbine and a generator. The plant delivers this electricity directly to the high-voltage grid, supplying green power to over 120,000 households. Furthermore, steam is provided to an increasing number of companies in the nearby Chemie Park Delfzijl, helping to make the industrial park more sustainable and achieve a CO2 reduction of 250,000 tons per year. With steam extraction (heat supply) and its efficient design, the plant achieves an efficiency of up to 87%.


It All Started with a Malfunction

As Eneco aims to operate climate-neutral by 2035, sustainability and energy savings are key focal points. Two years ago, Eneco took action by starting the replacement of existing fluorescent lighting in and around the boiler room. To ensure sustainability, the company insisted on using only high-quality fixtures with a long lifespan and a short payback period.


“It actually started with a defect in some emergency fixtures,” says Tom Bolte, EC&I technician at Eneco Bio Golden Raand. “I proposed to my manager that we place a larger order for fixtures with a supplier. We reached out to several suppliers, and itsme turned out to be the most cost-effective option.”


Eventually, it was decided to have the entire project carried out under the supervision of itsme. “Two factors were crucial in this decision: the cost, of course, but also the level of service, which itsme provided exceptionally well. Moreover, itsme was the only supplier to offer a total price for this project.”


"We reached out to several suppliers, and itsme turned out to be the most cost-effective."

The project required a significant financial investment. To assess its feasibility, Bolte decided to perform a calculation based on a conservative estimate of the electricity market price. This calculation also considered reduced energy costs and the possibility of selling surplus generated electricity. Including maintenance cost savings, the payback period turned out to be less than five years.


“It’s fantastic to have a system that pays for itself,” says Bolte. “Moreover, any energy you don’t use yourself here can be used by someone else, which is great for the environment. In every respect, this was a rewarding project.”


Installation with Heat Load

The boiler room is an eleven-story building with the combustion boiler at its center. The space is illuminated across all eleven floors with more than 550 fixtures. As the old fixtures were gradually deteriorating, it was clear that simply selecting any fixture for the new LED lighting wouldn’t suffice.

Due to the exceptionally high temperature in the combustion boiler, the temperature in the surrounding boiler room can also rise significantly, despite the ventilation. The new fixtures needed to withstand these conditions. The technical team at Eneco Bio Golden Raand tested four different brands of LED fixtures and installed them on-site. The Schuch Proxima 161 PX fixtures, specially designed for ambient temperatures up to 50°C, performed the best.


For the installation of the hundreds of fixtures, itsme enlisted installation partner Probis Nederland from Beilen. Probis also took care of the project management. “A lot of respect for how the team handled it,” says Bolte. “It was during the summer, and it’s incredibly hot in the boiler room. So, it wasn’t always a pleasant working environment.”


Due to the high temperatures, it was decided to adjust the work process. Instead of working from top to bottom in the boiler room, the decision was made to work from bottom to top. This approach aimed to reduce the heat load for the staff.


“To avoid the heat during the day, we worked several times in the evening.”

Hendrik van Voorthuizen, the project manager at Probis, remembers it well. “The experience was quite impressive. A complex factory, many height differences, many floors. Because you have to stand on a step to replace the fixture, while there’s a drop right next to you, the technicians were almost always required to use fall protection. Although the work wasn’t very complex, the high temperatures made it not always easy. At that time, we were dealing with a small heatwave in the Netherlands. The facility is made of metal, so yes, the indoor temperature increased significantly. That was a challenge. To avoid the heat during the day, we worked several times in the evening.”


Welcome Addition

According to van Voorthuizen, communication between the involved parties was based on mutual respect and trust. “This created an open line of communication, both between itsme and Probis, as well as with the joint client. Direct communication with Eneco, without the intervention of various intermediaries, was therefore easily possible.” The approach of itsme and Probis, a combination of material provision and installation work, resulted in greater effectiveness for the client. This collaboration is thus seen as successful and efficient. Van Voorthuizen: “I found it a particularly enjoyable and interesting project to carry out and am open to more of these kinds of projects, precisely because of the challenging aspects.”

For Eneco Bio Golden Raand, the comprehensive package from itsme was the deciding factor. “We have a relatively small group of people who keep the plant running here,” explains Bolte. “We are very versatile and have many different tasks. As a result, we don’t have enough time to handle such projects ourselves. For us, it was a welcome addition that we didn’t have to arrange everything ourselves. Taking care of a customer is quite important these days, and that’s a plus. Of course, a market-conform price is also important.”


Greener

Eneco Bio Golden Raand now contributes to a better environment in many ways. With the new LED fixtures from Schuch, maintenance costs are lowered because lamp replacements are now a thing of the past. This contributes to the continuity and safety of the business process. The energy consumption is also significantly reduced by switching to LED, with the energy-efficient Proxima fixtures consuming about 65% less power than their conventional predecessors.


Meanwhile, thoughts are being given to the lighting in the control room and other areas of the building. “We’re keeping good contact with itsme,” says Bolte. “We might be installing an e-boiler here, and then some expansion may be needed.” Even then, itsme will be happy to contribute to a green future for Eneco.


 

Check out our other success stories:

  • TESTIMONIAL
    1 dec. 2025
    Plukon - Scanning for the future
    The Plukon poultry slaughterhouse in Blokker has installations from all kinds of machine builders and suppliers. Each of these has its own control system and associated components from different brands. This situation has developed over time, with the result that Plukon lost track of the overall picture. When it became clear that many components were now obsolete, the company decided to have itsme carry out a FactoryScan. ‘This gives us more peace of mind and helps us to better plan the replacement of components for the future.’
    Read more
  • TESTIMONIAL
    17 nov. 2025
    Silmaco - Site assessment
    Kemira Rotterdam produces hydrogen peroxide in various grades at its Europoort site for applications such as water purification, cleaning beverage packaging and bleaching paper. As is customary in the process industry, the installation was lit 24/7 for safety reasons. Kemira felt that there was a smarter way to do this. That is why the company contacted itsme Lighting Technology. ‘In addition to saving energy, we are now also saving on maintenance.’
    Read more
  • TESTIMONIAL
    3 nov. 2025
    Kemira - Smart lighting for the process industry
    Kemira Rotterdam produces hydrogen peroxide in various grades at its Europoort site for applications such as water purification, cleaning beverage packaging and bleaching paper. As is customary in the process industry, the installation was lit 24/7 for safety reasons. Kemira felt that there was a smarter way to do this. That is why the company contacted itsme Lighting Technology. ‘In addition to saving energy, we are now also saving on maintenance.’
    Read more
  • TESTIMONIAL
    20 okt. 2025
    Damen - Modbus on board
    At Damen Shipyards Group, field service engineers fly all over the world to provide service and carry out repairs. In addition to mechanics and electronics, communication networks are becoming increasingly important, with Modbus as the standard protocol. To brush up on their people's knowledge, Damen went in search of Modbus training. The shipbuilder chose itsme because of the customisation and flexibility that the industrial service provider could offer. ‘Nowhere else could we find this level of expertise.’ Translated with DeepL.com (free version)
    Read more

Stay up to date with the latest news:

  • NEWS
    16 mrt. 2026
    Eaton - RMQ-Titan Advanced Indicator - Solution for visual status display in industrial applications
    With its robust design and improved functionality, the RMQ-Titan Advanced Indicator meets the highest standards of reliability and ease of use.
    Read more
  • NEWS
    16 mrt. 2026
    TURCK Automation Suite (TAS) simplifies IIoT for any technical installation
    With its robust design and improved functionality, the RMQ-Titan Advanced Indicator meets the highest standards of reliability and ease of use.
    Read more
  • NEWS
    11 feb. 2026
    Weidmüller - Cubeseries relay modules
    Weidmüller's Cubeseries relay modules have been developed for reliable switching, system decoupling and signal multiplication in various industrial environments. Thanks to their robust design, compact form factor and flexible connection techniques, they are suitable for both standard machines and more demanding process installations.
    Read more
  • NEWS
    4 feb. 2026
    Rittal - New F-gas Regulation
    The new European F-gas Regulation (EU) 2024/573 has been in force since 11 March 2024 and will be phased in gradually from 1 January 2025. The regulation is an important pillar of the European climate strategy and has one clear goal: to drastically reduce emissions of fluorinated greenhouse gases and ultimately phase them out completely by 2050. This has far-reaching consequences for the choice, use and future availability of refrigerants in industrial refrigeration and air conditioning systems.
    Read more

Why not take a look at these trainings we offer: